{"id":12958,"date":"2021-06-22T14:43:07","date_gmt":"2021-06-22T14:43:07","guid":{"rendered":"http:\/\/ndiqparate.al\/?p=12958"},"modified":"2022-05-19T12:52:58","modified_gmt":"2022-05-19T12:52:58","slug":"sectoral-division-concessions-and-ppps-approved-during-2017-2020","status":"publish","type":"post","link":"https:\/\/ndiqparate.al\/?p=12958&lang=en","title":{"rendered":"Sectoral Division Concessions and PPPs approved during 2017 &#8211; 2020"},"content":{"rendered":"\n<p>Open Data Albania is researching on Sectoral Division for Concessions and Public-Private Partnership (PPPs) approved in Albania during the period January 2017 &#8211; December 2020. The article identifies the number and value of investment, specifying the Institutional Sector and the Sectoral Category. The data are from the PPP Concession Register database published on the <a href=\"http:\/\/opencorporates.al\/sq\/concession\">OpenCorporates.al portal.<\/a><\/p>\n\n\n\n<p>During the period January 2017 until December 2020, <strong>24<\/strong> concession or PPP contracts were approved in Albania with a total investment value of 125 199 058 469 ALL or about 1 009 669 826 Euro. The Institutional Sector, where PPP Concessions are applied during this period, includes Energy, Transport, Environment, Urban Development, Health and Fiscal Control.<\/p>\n\n\n\n<div class=\"infogram-embed\" data-id=\"b434060b-e50e-4064-a17c-ba2a5615b58f\" data-type=\"interactive\" data-title=\"Untitled chart\"><\/div><script>!function(e,i,n,s){var t=\"InfogramEmbeds\",d=e.getElementsByTagName(\"script\")[0];if(window[t]&&window[t].initialized)window[t].process&&window[t].process();else if(!e.getElementById(n)){var o=e.createElement(\"script\");o.async=1,o.id=n,o.src=\"https:\/\/e.infogram.com\/js\/dist\/embed-loader-min.js\",d.parentNode.insertBefore(o,d)}}(document,0,\"infogram-async\");<\/script><div style=\"padding:8px 0;font-family:Arial!important;font-size:13px!important;line-height:15px!important;text-align:center;border-top:1px solid #dadada;margin:0 30px\"><a href=\"https:\/\/infogram.com\/b434060b-e50e-4064-a17c-ba2a5615b58f\" style=\"color:#989898!important;text-decoration:none!important;\" target=\"_blank\" rel=\"noopener noreferrer\">Untitled chart<\/a><br><a href=\"https:\/\/infogram.com\" style=\"color:#989898!important;text-decoration:none!important;\" target=\"_blank\" rel=\"nofollow noopener noreferrer\">Infogram<\/a><\/div>\n\n\n\n<p>The Institutional Energy Sector marks the largest number of contracts. The Institutional Transport Sector has the highest value of PPP Investments and Concessions.<\/p>\n\n\n\n<p>The Sectoral categories that have been applied during the four years are Waste Management; Road Infrastructure; Maritime Infrastructure Ports; Airport Infrastructure; Hydro Energy; Education; Health; Fiscal Control and Services.<\/p>\n\n\n\n<div class=\"infogram-embed\" data-id=\"792a89ce-7d82-4220-8881-b48ec86e0cb0\" data-type=\"interactive\" data-title=\"Untitled infographic\"><\/div><script>!function(e,i,n,s){var t=\"InfogramEmbeds\",d=e.getElementsByTagName(\"script\")[0];if(window[t]&&window[t].initialized)window[t].process&&window[t].process();else if(!e.getElementById(n)){var o=e.createElement(\"script\");o.async=1,o.id=n,o.src=\"https:\/\/e.infogram.com\/js\/dist\/embed-loader-min.js\",d.parentNode.insertBefore(o,d)}}(document,0,\"infogram-async\");<\/script><div style=\"padding:8px 0;font-family:Arial!important;font-size:13px!important;line-height:15px!important;text-align:center;border-top:1px solid #dadada;margin:0 30px\"><a href=\"https:\/\/infogram.com\/792a89ce-7d82-4220-8881-b48ec86e0cb0\" style=\"color:#989898!important;text-decoration:none!important;\" target=\"_blank\" rel=\"noopener noreferrer\">Untitled infographic<\/a><br><a href=\"https:\/\/infogram.com\" style=\"color:#989898!important;text-decoration:none!important;\" target=\"_blank\" rel=\"nofollow noopener noreferrer\">Infogram<\/a><\/div>\n\n\n\n<p>Sector category <strong>Road Infrastructure,<\/strong> three PPP Concessions with Investment value of 62 115 823 913 ALL have been approved. Specifically with the concession company <a href=\"http:\/\/opencorporates.al\/sq\/nuis\/L81618040T\">Gjoka 87<\/a> sh.pk implementing the contract PPP Concession for the Improvement, Construction, Operation and Maintenance of Arbri Road; the company <a href=\"http:\/\/opencorporates.al\/sq\/nuis\/L82306024Q\">Bardh Konstruksion<\/a> for the Design, Construction and Maintenance of the road segment Milot Balldre and the company Rruga <a href=\"http:\/\/opencorporates.al\/sq\/nuis\/L82327014A\">Orikum Llogara<\/a> sh.p.k. implementing the contract for the Design, Construction and Maintenance of the road segment Yacht Port-Bypass Orikum Dukat, Ura e Sh\u00ebn Eliz\u00ebs.<\/p>\n\n\n\n<p>In the category <strong>Seaport<\/strong> Infrastructure, a Concession Contract with an investment value of 1 374 984 000 ALL has been approved, namely the PPP Concession Contract of the tourist port and services Marina Limion with the company <a href=\"http:\/\/opencorporates.al\/sq\/nuis\/L94602803N\">Marina Limion<\/a> sh.a.<\/p>\n\n\n\n<p>Sector category <strong>Airport Infrastructure<\/strong> a PPP\/Concession Contract for Rehabilitation Operation Transfer of Kuk\u00ebs Airport from the concession company <a href=\"http:\/\/opencorporates.al\/sq\/nuis\/L97531201R\">Kuk\u00ebs<\/a> International Airport sh.pk is approved.<\/p>\n\n\n\n<p>For <strong>Services, a<\/strong> contract has been approved for the concession of some Maritime services with the company Ships of <a href=\"http:\/\/opencorporates.al\/sq\/nuis\/J61825517G\">Maritime Service<\/a> sh.a.<\/p>\n\n\n\n<p><strong>Waste Management<\/strong>, which includes the collection, transportation, recovery, disposal of waste and production of energy were adopted two concession PPP contracts worth 18,471,152,055 ALL or about 148 960 904 Euro, which represents about 14.8% of total investment value for all PPP Concessions approved in this period.<\/p>\n\n\n\n<p>This sector includes the contract for the construction of the landfill, incinerator and rehabilitation of Tirana existing landfills<em>,<\/em> with the concession company <a href=\"http:\/\/opencorporates.al\/sq\/nuis\/L72031013B\">Integrated Energy BV SPV<\/a> and the contract for the concession of cleaning, collection, transportation and selection of urban waste for the city of Kamza with the company <a href=\"http:\/\/opencorporates.al\/sq\/nuis\/L81811019S\">Eco Cleaning<\/a> sh.p.k.<\/p>\n\n\n\n<p>The Urban Development Sector marks two concessions with a total investment value of 4 102 552 269 ALL or about 33 085 099 Euro. Developments are in the sectoral category Education and they consists of a contract for improving the educational infrastructure in the Municipality of Tirana, area Tirana 1 with concessionary companies <a href=\"http:\/\/opencorporates.al\/sq\/nuis\/L81729026T\">ZMA<\/a> sh.pk and for improving the educational infrastructure in the Municipality of Tirana for four educational facilities in the area <a href=\"http:\/\/opencorporates.al\/sq\/nuis\/M02219001K\">Tirana 4<\/a> sh.p.k.<\/p>\n\n\n\n<p>During the period under review, a Public Private Partnership has been established in the Health Sector for the provision of laboratory services to university, regional and municipal hospitals, with the implementing concessionary company <a href=\"http:\/\/opencorporates.al\/sq\/nuis\/L91923002T\">Laboratory Networks<\/a> sh.p.k.<\/p>\n\n\n\n<p>Also, during this period, a contract was approved in the Fiscal Control sector, namely a Public Private Partnership for the legal control service of metering instruments, through fuel and liquefied gas distribution instruments, with the concessionary company <a href=\"http:\/\/opencorporates.al\/sq\/nuis\/L91918012B\">Noa Inspect<\/a> sh.p.k.<\/p>\n\n\n\n<div class=\"infogram-embed\" data-id=\"6cf44101-8f59-485d-941b-6a4f15d0cb45\" data-type=\"interactive\" data-title=\"Untitled infographic\"><\/div><script>!function(e,i,n,s){var t=\"InfogramEmbeds\",d=e.getElementsByTagName(\"script\")[0];if(window[t]&&window[t].initialized)window[t].process&&window[t].process();else if(!e.getElementById(n)){var o=e.createElement(\"script\");o.async=1,o.id=n,o.src=\"https:\/\/e.infogram.com\/js\/dist\/embed-loader-min.js\",d.parentNode.insertBefore(o,d)}}(document,0,\"infogram-async\");<\/script><div style=\"padding:8px 0;font-family:Arial!important;font-size:13px!important;line-height:15px!important;text-align:center;border-top:1px solid #dadada;margin:0 30px\"><a href=\"https:\/\/infogram.com\/6cf44101-8f59-485d-941b-6a4f15d0cb45\" style=\"color:#989898!important;text-decoration:none!important;\" target=\"_blank\" rel=\"noopener noreferrer\">Untitled infographic<\/a><br><a href=\"https:\/\/infogram.com\" style=\"color:#989898!important;text-decoration:none!important;\" target=\"_blank\" rel=\"nofollow noopener noreferrer\">Infogram<\/a><\/div>\n\n\n\n<p>The Energy Sector lists several PPP concession contracts, including contracts for the construction of the Kaliva\u00e7 Hydropower Plant which is implemented by the company <a href=\"http:\/\/opencorporates.al\/sq\/nuis\/L72321029P\">Ayen Alb<\/a> sh.pk; Concession for Construction, Operation and Transfer of KUKUR Hydropower Plant by <a href=\"http:\/\/opencorporates.al\/sq\/nuis\/L72024013M\">Kukur<\/a> Hidro Energy sh.pk; Concession Construction Operation and Transfer of Bushtrica 3 hydropower plant by <a href=\"http:\/\/opencorporates.al\/sq\/nuis\/L72120013S\">Bushtrica<\/a> Hydropower sh.pk; Concession Construction Operation Transfer of Guri i Bardh\u00eb hydropower plant with implementing concession company <a href=\"http:\/\/opencorporates.al\/sq\/nuis\/L76607401A\">GealbEnergy<\/a> sh.pk; Concession Construction Operation Transfer of Lunik hydropower plant from the concession company <a href=\"http:\/\/opencorporates.al\/sq\/nuis\/L73307203M\">Victoria Hydroenergy<\/a> sh.pk; concession Construction Operation Transfer of Bushtrica hydropower plant with implementing company <a href=\"http:\/\/opencorporates.al\/sq\/nuis\/L73308201B\">Elenergji<\/a> sh.pk; contract Construction Operation Transfer of hydropower plants on the river Shushica with implementing concession company <a href=\"..\/..\/My%20Documents\/Downloads\/FW__Airport_Vlore_\">Shushica<\/a> Hydropower sh.pk; <a href=\"http:\/\/opencorporates.al\/sq\/nuis\/L72023004I\">Concession Construction Operation Transfer of Grabova 2<\/a> hydropower plant with concession company HK HEC Grabova 2 sh.pk; Concession Construction Operation Transfer of hydropower plants Shutri 1, Shutri 2 with implementing concession company <a href=\"http:\/\/opencorporates.al\/sq\/nuis\/L78305901P\">ATEANI<\/a> Energy sh.pk; Contract Construction Operation Transfer of Lusa hydropower plants from <a href=\"http:\/\/opencorporates.al\/sq\/nuis\/L72011006K\">Idrolusa<\/a> sh.pk; Contract Concession Construction Operation Transfer of hydropower plants on Shala River with implementing company 3 Power Shala sh.pk; Concession Construction Operation Transfer of hydropower plant Veleshica with company <a href=\"http:\/\/opencorporates.al\/sq\/nuis\/L81818009A\">Kalisi<\/a> Hydropower sh.pk<\/p>\n\n\n\n<p>Concession and PPP Contracts, in force, data, and Documents on Companies Registered for their Implementation, are published in an easily accessible and well-structured format under the <a href=\"http:\/\/www.opencorporates.al\/sq\/concession\">OpenCorporates.al. <\/a>portal, <a href=\"http:\/\/www.opencorporates.al\/sq\/concession\">Concession <\/a>Register Database. The Excel document of this article contains data and information on the basis of which the visualization is done. This document is easily downloadable and free to use. Other databases of the AIS Organization include; <a href=\"http:\/\/spending.data.al\/\">spending.data<\/a>.al; <a href=\"http:\/\/openprocurement.al\/\">OpenPocurement<\/a>.al, and <a href=\"http:\/\/www.opencorporates.al\/sq\/concession\">Open Corporates<\/a>.al<\/p>\n\n\n\n<p>This article was drafted and published in the framework of the &#8220;Open Data, Access and Transparency over sectors exposed to Risk of Corruption&#8221; <a href=\"http:\/\/ais.al\/new\/open-data-access-and-transparency-over-sectors-exposed-to-risk-of-corruption\/\">project<\/a>. The latter is financially supported by SIDA &#8211; Sweden International Development Cooperation Agency<\/p>\n\n\n\n<b>Download excel:<\/b> <a href=\"https:\/\/ndiqparate.al\/wp-content\/uploads\/2021\/06\/Ndarja-Sektoriale-Koncesione-dhe-PPP-te-miratuara-2017-\u2013-2020_eng.xls\">Sectoral Division Concessions and PPPs approved during 2017 &#8211; 2020<\/a><br>\n<b>Comment and Analysis:<\/b> Open Data Albania<br>\n<b>Translated by:<\/b> Etleva Kondak\u00e7i \n\n<style>\np{\ntext-align: justify !important;\n}\n<\/style>\n","protected":false},"excerpt":{"rendered":"<p>Open Data Albania is researching on Sectoral Division for Concessions and Public-Private Partnership (PPPs) approved in Albania during the period January 2017 &#8211; December 2020. The article identifies the number and value of investment, specifying the Institutional Sector and the Sectoral Category. The data are from the PPP Concession Register database published on the OpenCorporates.al portal. During the period January 2017 until December 2020, 24&hellip; <\/p>\n","protected":false},"author":1,"featured_media":14097,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"spay_email":"","jetpack_publicize_message":"","jetpack_is_tweetstorm":false},"categories":[563,57],"tags":[],"jetpack_featured_media_url":"https:\/\/i2.wp.com\/ndiqparate.al\/wp-content\/uploads\/2021\/06\/ndiq4.jpg?fit=815%2C655&ssl=1","jetpack_publicize_connections":[],"jetpack_sharing_enabled":true,"jetpack-related-posts":[{"id":24340,"url":"https:\/\/ndiqparate.al\/?p=24340&lang=en","url_meta":{"origin":12958,"position":0},"title":"Draft Law on PPP Concessions: AIS (NGO) Raises Concerns regarding Compliance with EU Directives and Calls for Thorough Revision","date":"June 13, 2025","format":false,"excerpt":"The organization AIS, promoter of Open Data Albania, has taken part in the public consultation process with the Albanian Government following the preparation of the Draft Law on Concessions and Public - Private Partnerships (PPP). This draft law represents both an obligation and a commitment by the Albanian State to\u2026","rel":"","context":"In &quot;ODA in Press Releases&quot;","img":{"alt_text":"","src":"https:\/\/i2.wp.com\/ndiqparate.al\/wp-content\/uploads\/2025\/06\/Screenshot-2025-06-13-143412-1.png?fit=1200%2C721&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":25285,"url":"https:\/\/ndiqparate.al\/?p=25285&lang=en","url_meta":{"origin":12958,"position":1},"title":"AIS Position on the Upcoming Rule of Law Report","date":"February 20, 2026","format":false,"excerpt":"The organization AIS wishes to express its concerns regarding several critical aspects of the rule of law in Albania, with a focus on the State-Owned Enterprises (SOEs) sector and legislation affecting Public Procurement, Public-Private Partnerships (PPPs), and the privatization of state assets. 1. The SOE Sector as a High-Risk Area\u2026","rel":"","context":"In &quot;ODA in Press Releases&quot;","img":{"alt_text":"","src":"https:\/\/i1.wp.com\/ndiqparate.al\/wp-content\/uploads\/2026\/05\/Screenshot-2026-05-27-090928.png?resize=350%2C200&ssl=1","width":350,"height":200},"classes":[]},{"id":24194,"url":"https:\/\/ndiqparate.al\/?p=24194&lang=en","url_meta":{"origin":12958,"position":2},"title":"Personal corruption stories or case studies developed from database or NIS assessments illustrating the social impact of Corruption","date":"November 1, 2024","format":false,"excerpt":"1.Investigative Case PPP Incinerators: See the full case data and analysis available in PDF and Excel formats. 2.Appropriation of State Property, Military Sector: See the full case data and analysis available in PDF and Excel formats. 3.Investigative Case PPP Agreement, Health Sector: See the full case data and analysis available\u2026","rel":"","context":"In &quot;ODA in Press Releases&quot;","img":{"alt_text":"","src":"https:\/\/i0.wp.com\/ndiqparate.al\/wp-content\/uploads\/2025\/05\/Screenshot-2025-05-26-225751.png?fit=1200%2C762&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":24178,"url":"https:\/\/ndiqparate.al\/?p=24178&lang=en","url_meta":{"origin":12958,"position":3},"title":"Report on the National Integrity System (NIS): Focused on Facts, Graphs, Data, and Visuals to Understand the Country\u2019s Key Sectors","date":"June 20, 2024","format":false,"excerpt":"The Assessment Report of the National Integrity System for Albania was finalized in November 2023 and was conducted by the Institute for Democracy and Mediation (IDM) as part of Transparency International\u2019s project \u201cEU4 Rule of Law: Citizen Engagement for Public Integrity (CEPI) in the Western Balkans and Turkey.\u201d The report\u2026","rel":"","context":"In &quot;ODA in Press Releases&quot;","img":{"alt_text":"","src":"https:\/\/i1.wp.com\/ndiqparate.al\/wp-content\/uploads\/2025\/05\/Screenshot-2025-05-26-182314.png?fit=551%2C786&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":24852,"url":"https:\/\/ndiqparate.al\/?p=24852&lang=en","url_meta":{"origin":12958,"position":4},"title":"Albania Multi-Stakeholder Approach to Corruption Prevention. International Perspectives and Civil Society Insights on Corruption Risk Assessment","date":"October 31, 2025","format":false,"excerpt":"AIS participated in the National Event organized by UNODC \u2013 United Nations Office on Drugs and Crime, in partnership with the Regional Anti-Corruption Initiative and the Minister of State for Public Administration and Anti-Corruption. The event was held on 31 October 2025. Three key moments of cross-sectoral engagement in Corruption\u2026","rel":"","context":"In &quot;ODA in Press Releases&quot;","img":{"alt_text":"","src":"https:\/\/i2.wp.com\/ndiqparate.al\/wp-content\/uploads\/2026\/01\/72c7cc06-e222-43cf-8f00-0f326517f9b3.jpg?fit=900%2C1200&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":25187,"url":"https:\/\/ndiqparate.al\/?p=25187&lang=en","url_meta":{"origin":12958,"position":5},"title":"Civil Society Calls on Parliament Not to Undermine Transparency, Parliamentary Scrutiny, and Public Consultation in Accelerated Procedures for EU Integration Legislation","date":"March 14, 2026","format":false,"excerpt":"Joint Statement by Civil Society Organisations on the Draft Decision to Amend the Rules of Procedure of the Parliament of Albania\u00a0 Tirana, 13 March 2026\u00a0 A coalition of 31\u00a0civil society organisations, including\u00a0AIS \/ Open Data Albania,\u00a0has issued a joint statement raising concerns about the Draft Decision to Amend the Rules\u2026","rel":"","context":"In &quot;ODA in Press Releases&quot;","img":{"alt_text":"","src":"https:\/\/i0.wp.com\/ndiqparate.al\/wp-content\/uploads\/2026\/03\/Screenshot-2026-03-14-153004-1.png?fit=1165%2C656&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]}],"jetpack_shortlink":"https:\/\/wp.me\/pcJP0S-3n0","_links":{"self":[{"href":"https:\/\/ndiqparate.al\/index.php?rest_route=\/wp\/v2\/posts\/12958"}],"collection":[{"href":"https:\/\/ndiqparate.al\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ndiqparate.al\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/ndiqparate.al\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/ndiqparate.al\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=12958"}],"version-history":[{"count":3,"href":"https:\/\/ndiqparate.al\/index.php?rest_route=\/wp\/v2\/posts\/12958\/revisions"}],"predecessor-version":[{"id":17264,"href":"https:\/\/ndiqparate.al\/index.php?rest_route=\/wp\/v2\/posts\/12958\/revisions\/17264"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/ndiqparate.al\/index.php?rest_route=\/wp\/v2\/media\/14097"}],"wp:attachment":[{"href":"https:\/\/ndiqparate.al\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=12958"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ndiqparate.al\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=12958"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ndiqparate.al\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=12958"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}