{"id":13436,"date":"2021-08-18T10:59:18","date_gmt":"2021-08-18T10:59:18","guid":{"rendered":"http:\/\/ndiqparate.al\/?p=13436"},"modified":"2022-05-18T10:38:13","modified_gmt":"2022-05-18T10:38:13","slug":"volume-of-work-at-port-of-durres-90-of-the-maritime-transport-goods-processed-in-durres","status":"publish","type":"post","link":"https:\/\/ndiqparate.al\/?p=13436&lang=en","title":{"rendered":"90% of the maritime transported goods are processed in the Port of Durr\u00ebs"},"content":{"rendered":"\n<p>Open Data Albania is investigating into the volume of transported goods at Port of Durr\u00ebs. The need for investigation is related to the decision of the Albanian Government to terminate the existence of Durr\u00ebs Port as a Merchants Port, transforming its territory into a luxury residential area and a port for vessels for individual use only. The data provided by the Institute of Statistics have very little information on the volume and categories of goods and services by value versus the national trade and transport. This article will present data on the volume of goods processed in the Port of Durres in the last decade, identifying the growing trend or interest in transport through this Port.<\/p>\n\n\n\n<p>Durr\u00ebs or, as it is known since antiquity, Dyrrahu, is developed since ancient times as an important gateway for the region. The Roman Empire or the Byzantine Empire in the VII to XII century, recognized Durr\u00ebs as one of the main pillars of trade. The city is long characterized by the development that came along with this Seaport. The port has already exceeded its processing capacity of 1000 tons per linear meter five decades ago, and it also has piers that allow storage and processing of crude ore intended for transport. Currently, the Albanian Government states that it will enable the transfer of the Port and Maritime Volume from Durr\u00ebs to Porto Romano. The latter is a port for which there is no detailed technical project yet and a service provider is needed to create one. The detailed design of the New Integrated Commercial Port of Durr\u00ebs in Porto Romano is the object of a <a href=\"http:\/\/openprocurement.al\/sq\/pcompany\/view\/id\/7637\/isbashki\/0\">call<\/a> for tenders published in June 2021 by the State Authorities. In any case, an initial project may not be ready until at least the second half of 2022, while a feasibility study is expected to objectively take even longer than the Project. The relocation of the Port of Durres leads to many questions regarding the European Project known as the (Commercial) Corridor VIII, an important corridor for our country and very crucial for the national economy. This Project, Corridor VIII, is a program the country should aim and compete for development. One of the alternatives for the development of international transport in the Region is Corridor X, which engages two other important ports of the Region, located in neighboring Greece.<\/p>\n\n\n\n<p>The largest volume of goods in the Port of Durres was recorded in 2019 with 4.6 million tons of goods. The year 2020 has seen a decline in freight transport through this port as a result of restrictions on shipping to some countries caused by the Covid-19 pandemic.&nbsp; The lowest volume of goods entering and leaving the port of Durres was recorded in 2016.<\/p>\n\n\n\n<div class=\"infogram-embed\" data-id=\"c25804a4-b2f7-46d5-be65-73229f877b56\" data-type=\"interactive\" data-title=\"Untitled infographic\"><\/div><script>!function(e,i,n,s){var t=\"InfogramEmbeds\",d=e.getElementsByTagName(\"script\")[0];if(window[t]&&window[t].initialized)window[t].process&&window[t].process();else if(!e.getElementById(n)){var o=e.createElement(\"script\");o.async=1,o.id=n,o.src=\"https:\/\/e.infogram.com\/js\/dist\/embed-loader-min.js\",d.parentNode.insertBefore(o,d)}}(document,0,\"infogram-async\");<\/script><div style=\"padding:8px 0;font-family:Arial!important;font-size:13px!important;line-height:15px!important;text-align:center;border-top:1px solid #dadada;margin:0 30px\"><a href=\"https:\/\/infogram.com\/c25804a4-b2f7-46d5-be65-73229f877b56\" style=\"color:#989898!important;text-decoration:none!important;\" target=\"_blank\" rel=\"noopener noreferrer\">Untitled infographic<\/a><br><a href=\"https:\/\/infogram.com\" style=\"color:#989898!important;text-decoration:none!important;\" target=\"_blank\" rel=\"nofollow noopener noreferrer\">Infogram<\/a><\/div>\n\n\n\n<p>Our country currently has four Seaports that guarantee the processing of goods, namely Durres, Saranda, Shengjin and Vlora. In 2018, the port of Durr\u00ebs has done 92.9% of the total volume of goods transported by ports, doing thus the largest ever realized volume of goods versus the total. In 2020, this port despite the impact of the pandemic, has played a major role in the exchange of goods, maintaining a strong position versus other ports by 90.8%. As illustrated in the table presenting the weight of the Port of Durres in the Maritime Trade of Goods, the Removal of the Port of Durres from the Map of Seaports, while a Replacing Port is not yet Designed, Studied, Initiated, Built, Tested, Accredited and Consolidated, could damage the national economy by shrinking the marine trade capacity by about 90%.<\/p>\n\n\n\n<div class=\"infogram-embed\" data-id=\"754d9113-3751-46dc-8af7-e0dfa3a3d4db\" data-type=\"interactive\" data-title=\"Untitled infographic\"><\/div><script>!function(e,i,n,s){var t=\"InfogramEmbeds\",d=e.getElementsByTagName(\"script\")[0];if(window[t]&&window[t].initialized)window[t].process&&window[t].process();else if(!e.getElementById(n)){var o=e.createElement(\"script\");o.async=1,o.id=n,o.src=\"https:\/\/e.infogram.com\/js\/dist\/embed-loader-min.js\",d.parentNode.insertBefore(o,d)}}(document,0,\"infogram-async\");<\/script><div style=\"padding:8px 0;font-family:Arial!important;font-size:13px!important;line-height:15px!important;text-align:center;border-top:1px solid #dadada;margin:0 30px\"><a href=\"https:\/\/infogram.com\/754d9113-3751-46dc-8af7-e0dfa3a3d4db\" style=\"color:#989898!important;text-decoration:none!important;\" target=\"_blank\" rel=\"noopener noreferrer\">Untitled infographic<\/a><br><a href=\"https:\/\/infogram.com\" style=\"color:#989898!important;text-decoration:none!important;\" target=\"_blank\" rel=\"nofollow noopener noreferrer\">Infogram<\/a><\/div>\n\n\n\n<p>The Port of Durres has played a crucial role in the exchange of commercial goods with other countries while we still do not have a Feasibility Study on the potential capacities and yields of the port of Porto Romano for exchanging this volume of goods realized so far through the port of Durres.<\/p>\n\n\n\n<p>Concession and PPP Contracts, in force, data, and Documents on Companies Registered for their Implementation, are published in an easily accessible and well-structured format under the&nbsp;<a href=\"http:\/\/www.opencorporates.al\/sq\/concession\">OpenCorporates.al.&nbsp;<\/a>portal,&nbsp;<a href=\"http:\/\/www.opencorporates.al\/sq\/concession\">Concession&nbsp;<\/a>Register Database. The <a href=\"https:\/\/ndiqparate.al\/wp-content\/uploads\/2021\/08\/AIS-6.-Vellimi-i-Punes-Porti-i-Durresit-90-e-mallrave-te-transportit-detar-perpunohen-ne-Durres_English.xls\">Excel<\/a> document of this article contains data and information on the basis of which the visualization is done. This document is easily downloadable and free to use. Other databases of the AIS Organization include;&nbsp;<a href=\"http:\/\/spending.data.al\/\">spending.data<\/a>.al;&nbsp;<a href=\"http:\/\/openprocurement.al\/\">OpenPocurement<\/a>.al, and&nbsp;<a href=\"http:\/\/www.opencorporates.al\/sq\/concession\">Open Corporates<\/a>.al<\/p>\n\n\n\n<p>This research paper is being published as part of the\u00a0<em>Open Data, Access and Transparency over sectors to Risk of Corruption project<\/em>.<\/p>\n\n\n\n<b>Download excel:<\/b> <a href=\"https:\/\/ndiqparate.al\/wp-content\/uploads\/2021\/08\/AIS-6.-Vellimi-i-Punes-Porti-i-Durresit-90-e-mallrave-te-transportit-detar-perpunohen-ne-Durres_English.xls\">Volume of Work at Port of Durr\u00ebs, 90% of the maritime transport goods processed in Durres<\/a><br>\n<b>Comment and Analysis:<\/b> Open Data Albania<br>\n<b>Translated by:<\/b> Etleva Kondak\u00e7i \n\n<style>\np{\ntext-align: justify !important;\n}\n<\/style>\n","protected":false},"excerpt":{"rendered":"<p>Open Data Albania is investigating into the volume of transported goods at Port of Durr\u00ebs. The need for investigation is related to the decision of the Albanian Government to terminate the existence of Durr\u00ebs Port as a Merchants Port, transforming its territory into a luxury residential area and a port for vessels for individual use only. The data provided by the Institute of Statistics have&hellip; <\/p>\n","protected":false},"author":1,"featured_media":14093,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"spay_email":"","jetpack_publicize_message":"","jetpack_is_tweetstorm":false},"categories":[563,136,57,1362],"tags":[],"jetpack_featured_media_url":"https:\/\/i2.wp.com\/ndiqparate.al\/wp-content\/uploads\/2021\/08\/ndiq.jpg?fit=793%2C688&ssl=1","jetpack_publicize_connections":[],"jetpack_sharing_enabled":true,"jetpack-related-posts":[{"id":23302,"url":"https:\/\/ndiqparate.al\/?p=23302&lang=en","url_meta":{"origin":13436,"position":0},"title":"Vox News: Edmond Shahini, the brother of Emiriana Sako's husband (the Mayor of Durr\u00ebs), won a no-competition tender with a limited fund in the Municipality of Durr\u00ebs","date":"September 14, 2024","format":false,"excerpt":"Title: The brother-in-law of Emiriana Sako won a no-competition tender with a limited fund in the Municipality of Durr\u00ebs Published: May 19, 2024","rel":"","context":"In &quot;ODA in media&quot;","img":{"alt_text":"","src":"https:\/\/i2.wp.com\/ndiqparate.al\/wp-content\/uploads\/2025\/01\/Screenshot-2025-01-14-111220.png?fit=802%2C789&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":23339,"url":"https:\/\/ndiqparate.al\/?p=23339&lang=en","url_meta":{"origin":13436,"position":1},"title":"Information Portal Droni.al writes: Durr\u00ebs, Electoral corruption starts from the Municipality. 2021 Post-Earthquake Fund Tenders awared","date":"January 8, 2025","format":false,"excerpt":"Title: Durr\u00ebs, Electoral corruption starts from the Municipality. 2021 Post-Earthquake Fund Tenders awared Published: October 22, 2024","rel":"","context":"In &quot;ODA in media&quot;","img":{"alt_text":"","src":"https:\/\/i0.wp.com\/ndiqparate.al\/wp-content\/uploads\/2025\/01\/Screenshot-2025-01-14-121107.png?fit=781%2C888&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":24154,"url":"https:\/\/ndiqparate.al\/?p=24154&lang=en","url_meta":{"origin":13436,"position":2},"title":"Concerns and Advocacy for Transparency on the Beneficial Ownership of Companies Providing Consultancy to the Albanian Government in Strategic Sectors","date":"August 26, 2024","format":false,"excerpt":"Three civil society organizations, engaged in issues related to transparency, anti-corruption, good governance, and reporting on organized crime and corruption, namely: The Albanian Network for Reporting on Organized Crime and Corruption, with Executive Director Lindita \u00c7elaThe Albanian Center for Economic Research (ACER), with Executive Director Mr. Zef Pre\u00e7iThe Albanian Institute\u2026","rel":"","context":"In &quot;ODA in Press Releases&quot;","img":{"alt_text":"","src":"https:\/\/i0.wp.com\/ndiqparate.al\/wp-content\/uploads\/2025\/05\/Screenshot-2025-05-26-163749.png?fit=972%2C848&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":24097,"url":"https:\/\/ndiqparate.al\/?p=24097&lang=en","url_meta":{"origin":13436,"position":3},"title":"THE INFLUENCE OF ORGANIZED CRIME ON ELECTORAL PROCESSES AND FACT-BASED YOURNALISM","date":"May 7, 2025","format":false,"excerpt":"Between 2023 and 2025, the Special Prosecution Office Against Organized Crime and Corruption (SPAK) has taken significant action against several structured criminal groups suspected of involvement in electoral crimes during the 2021 elections, particularly in the districts of Shkod\u00ebr, Durr\u00ebs, Elbasan, and Lezha. Investigative media reports have revealed that some\u2026","rel":"","context":"In &quot;ODA in Press Releases&quot;","img":{"alt_text":"","src":"https:\/\/i2.wp.com\/ndiqparate.al\/wp-content\/uploads\/2025\/05\/logo5.png?fit=800%2C800&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":21936,"url":"https:\/\/ndiqparate.al\/?p=21936&lang=en","url_meta":{"origin":13436,"position":4},"title":"Mis-Use of Public Funds during Election Period: Civil Society Call for Amendments to Electoral Legislation ahead of 2025 Elections","date":"July 25, 2024","format":false,"excerpt":"Three civil society organizations engaged in issues of transparency, accountability and democratic culture have recently addressed a letter to the Parliamentary Committee for Legal Affairs and the Group of Dialogue. More specifically: \u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0the Albanian Institute of Sciences (AIS), promoter of Open Data Albania, with Executive Director Mrs. Aranita Brahaj. \u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0the\u2026","rel":"","context":"In &quot;ODA in Press Releases&quot;","img":{"alt_text":"","src":"https:\/\/i2.wp.com\/ndiqparate.al\/wp-content\/uploads\/2024\/07\/Screenshot-2024-07-24-164645-1.png?fit=933%2C557&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":23234,"url":"https:\/\/ndiqparate.al\/?p=23234&lang=en","url_meta":{"origin":13436,"position":5},"title":"Collaboration with Institutions. There has been public pressure for investigations and audits of reported high-risk cases.","date":"November 13, 2024","format":false,"excerpt":"The High State Audit (ALSAI), in preparing its Annual Audit Planning Methodology document, published in March 2024, (page 7), listed AIS\u2019s Open Data platforms - Open Procurement Albania and Open Spending Albania - as sources contributing to the collection of information and alerts during the drafting it\u2019s the Annual Audit\u2026","rel":"","context":"In &quot;ODA in Press Releases&quot;","img":{"alt_text":"","src":"https:\/\/i2.wp.com\/ndiqparate.al\/wp-content\/uploads\/2025\/01\/image-2-1.png?fit=1153%2C873&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]}],"jetpack_shortlink":"https:\/\/wp.me\/pcJP0S-3uI","_links":{"self":[{"href":"https:\/\/ndiqparate.al\/index.php?rest_route=\/wp\/v2\/posts\/13436"}],"collection":[{"href":"https:\/\/ndiqparate.al\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ndiqparate.al\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/ndiqparate.al\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/ndiqparate.al\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=13436"}],"version-history":[{"count":8,"href":"https:\/\/ndiqparate.al\/index.php?rest_route=\/wp\/v2\/posts\/13436\/revisions"}],"predecessor-version":[{"id":17216,"href":"https:\/\/ndiqparate.al\/index.php?rest_route=\/wp\/v2\/posts\/13436\/revisions\/17216"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/ndiqparate.al\/index.php?rest_route=\/wp\/v2\/media\/14093"}],"wp:attachment":[{"href":"https:\/\/ndiqparate.al\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=13436"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ndiqparate.al\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=13436"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ndiqparate.al\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=13436"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}