{"id":6123,"date":"2012-02-28T12:03:12","date_gmt":"2012-02-28T12:03:12","guid":{"rendered":""},"modified":"2012-02-28T12:03:12","modified_gmt":"2012-02-28T12:03:12","slug":"zeri-i-popullit-pas-bllokimit-te-informacionit-nga-qeveria-shoqeria-civile-tenton-te-jape-te-dhenat-e-para","status":"publish","type":"post","link":"https:\/\/ndiqparate.al\/?p=6123","title":{"rendered":"Zeri i Popullit: Pas bllokimit te informacionit nga qeveria, shoq\u00ebria civile tenton te jap\u00eb te dhenat e para"},"content":{"rendered":"<div style=\"text-align: justify;\">Nd\u00ebrtimi i rrug\u00ebs Durr\u00ebs-Kuk\u00ebs \u00ebsht\u00eb nd\u00ebr projektet q\u00eb konsiderohet si problemi kryesor i financave publike, q\u00eb \u00ebsht\u00eb niveli i lart\u00eb i borxhit. Akoma dhe sot, qeveria Berisha nuk ka dhen\u00eb nj\u00eb shif\u00ebr t\u00eb sakt\u00eb t\u00eb fondit t\u00eb harxhuar p\u00ebr ket\u00eb rrug\u00eb. Megjith\u00ebse \u00ebsht\u00eb m\u00eb e vog\u00ebl se realiteti, shoq\u00ebria civile po tenton t\u00eb jap\u00eb shifrat e para.<\/p>\n<p>Nd\u00ebrtimi i rrug\u00ebs Durr\u00ebs-Kuk\u00ebs \u00ebsht\u00eb nd\u00ebr projektet q\u00eb konsiderohet si problemi kryesor i financave publike, q\u00eb \u00ebsht\u00eb niveli i lart\u00eb i borxhit.&nbsp; Akoma dhe sot, qeveria Berisha nuk ka dhen\u00eb nj\u00eb shif\u00ebr t\u00eb sakt\u00eb t\u00eb fondit t\u00eb harxhuar p\u00ebr ket\u00eb rrug\u00eb. Megjith\u00ebse \u00ebsht\u00eb m\u00eb e vog\u00ebl se realiteti, shoq\u00ebria civile po tenton t\u00eb jap\u00eb shifrat e para.<\/p>\n<p>K\u00ebshtu, \u201c<span style=\"color: rgb(23, 15, 255);\">Open Data Albania<\/span>\u201d, nj\u00eb projekt i financuar nga SOROS-i, ka realizuar nj\u00eb analiz\u00eb p\u00ebr k\u00ebt\u00eb projekt, bazuar n\u00eb t\u00eb dh\u00ebnat zyrtare t\u00eb Ministris\u00eb s\u00eb Financave. <\/p>\n<p>Sipas k\u00ebsaj analize, rruga Durr\u00ebs-Kuk\u00ebs ka kushtuar n\u00eb total 98.7 miliard\u00eb lek\u00eb, shif\u00ebr e investuar p\u00ebrgjat\u00eb viteve 2006-2010. P\u00ebr k\u00ebt\u00eb periudh\u00eb, rruga e kombit ka thithur 50 p\u00ebr qind t\u00eb totalit t\u00eb investimeve t\u00eb t\u00eb gjitha rrug\u00ebve komb\u00ebtare.&nbsp; \u201cN\u00eb vitin 2008 projekti u financua nga fondet e huaja me 31.8 miliard\u00eb lek\u00eb, gj\u00eb q\u00eb ndikoi edhe n\u00eb rritjen e borxhit t\u00eb jasht\u00ebm p\u00ebr at\u00eb vit n\u00eb 39.7 miliard\u00eb. <\/p>\n<p>Nd\u00ebrsa n\u00eb vitin 2009 pesh\u00ebn e mbajti financimi i brendsh\u00ebm, gj\u00eb q\u00eb p\u00ebrkon me nj\u00eb rritje t\u00eb borxhit t\u00eb brendsh\u00ebm p\u00ebr financimin e deficitit\u201d,- theksohet n\u00eb analiz\u00ebn e \u201cOpen Date Albania\u201d.&nbsp; Investimet p\u00ebr rrug\u00ebn Durr\u00ebs-Kuk\u00ebs kan\u00eb ardhur n\u00eb rritje, duke kulmuar n\u00eb vitin 2009 me 38.5 miliard\u00eb lek\u00eb.&nbsp; Analiza evidenton se rruga e kombit \u00ebsht\u00eb nj\u00eb nd\u00ebr arsyet e nivelit t\u00eb lart\u00eb t\u00eb borxhit publik t\u00eb vendit. Tregues q\u00eb aktualisht \u00ebsht\u00eb rreth 60 p\u00ebr qind i Produktit t\u00eb Brendsh\u00ebm Bruto, nj\u00eb nivel i konsideruar shum\u00eb i lart\u00eb nga Fondi Monetar Nd\u00ebrkomb\u00ebtar dhe Banka Bot\u00ebrore. <\/p>\n<div style=\"text-align: center;\"><img border=\"0\" alt=\"\" src=\"\/uploadserise\/foto\/gazeta_skanim_zeri_popullit.jpg\" \/>\n  <\/div>\n<p><span style=\"font-weight: bold;\">Gazeta Zeri i Popullit, Ekonomi, Data: Premte 11 Shkurt 2011.<\/span><br \/> \n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Nd\u00ebrtimi i rrug\u00ebs Durr\u00ebs-Kuk\u00ebs \u00ebsht\u00eb nd\u00ebr projektet q\u00eb konsiderohet si problemi kryesor i financave publike, q\u00eb \u00ebsht\u00eb niveli i lart\u00eb i borxhit. Akoma dhe sot, qeveria Berisha nuk ka dhen\u00eb nj\u00eb shif\u00ebr t\u00eb sakt\u00eb t\u00eb fondit t\u00eb harxhuar p\u00ebr ket\u00eb rrug\u00eb. Megjith\u00ebse \u00ebsht\u00eb m\u00eb e vog\u00ebl se realiteti, shoq\u00ebria civile po tenton t\u00eb jap\u00eb shifrat e para. Nd\u00ebrtimi i rrug\u00ebs Durr\u00ebs-Kuk\u00ebs \u00ebsht\u00eb nd\u00ebr projektet q\u00eb&hellip; <\/p>\n","protected":false},"author":18,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"spay_email":"","jetpack_publicize_message":"","jetpack_is_tweetstorm":false},"categories":[41],"tags":[],"jetpack_featured_media_url":"","jetpack_publicize_connections":[],"jetpack_sharing_enabled":true,"jetpack-related-posts":[],"jetpack_shortlink":"https:\/\/wp.me\/pcJP0S-1AL","_links":{"self":[{"href":"https:\/\/ndiqparate.al\/index.php?rest_route=\/wp\/v2\/posts\/6123"}],"collection":[{"href":"https:\/\/ndiqparate.al\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ndiqparate.al\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/ndiqparate.al\/index.php?rest_route=\/wp\/v2\/users\/18"}],"replies":[{"embeddable":true,"href":"https:\/\/ndiqparate.al\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=6123"}],"version-history":[{"count":0,"href":"https:\/\/ndiqparate.al\/index.php?rest_route=\/wp\/v2\/posts\/6123\/revisions"}],"wp:attachment":[{"href":"https:\/\/ndiqparate.al\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=6123"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ndiqparate.al\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=6123"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ndiqparate.al\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=6123"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}