{"id":8598,"date":"2012-11-12T15:31:04","date_gmt":"2012-11-12T15:31:04","guid":{"rendered":""},"modified":"2012-11-12T15:31:04","modified_gmt":"2012-11-12T15:31:04","slug":"use-of-electricity-during-years-1998-2010","status":"publish","type":"post","link":"https:\/\/ndiqparate.al\/?p=8598&lang=en","title":{"rendered":"Use of electricity during years 1998-2010"},"content":{"rendered":"\n<div style=\"text-align: justify;\">Use of electricity is one of the parameters that enables us to analyze the efficiency of the utilization of the electric energy. Total sources of electricity serve one or more of the following main categories: consumers, export, and losses in the grid.<\/p>\n<p>  <script type=\"text\/javascript\" src=\"http:\/\/ajax.googleapis.com\/ajax\/static\/modules\/gviz\/1.0\/chart.js\">{\n\t\"chartType\":\"ColumnChart\",\n\t\"chartName\":\"Chart 1\",\n\t\"dataSourceUrl\":\"https:\/\/docs.google.com\/spreadsheet\/tq?range=A3%3AD16&key=0Agylwmr5tEbVdDM3bVR6c0pLUkw0TTh3MkdUS1lsQUE&gid=0&headers=-1\",\n\t\"options\":{\"width\":600,\"height\":371,\"title\":\"Use of Electricity during years 1998-2010 (in GWh)\",\"legend\":\"right\",\"isStacked\":false,\n\t\"hAxis\": {\"title\": 'Year', \"titleTextStyle\": {\"color\": 'red'}},\n\t \"vAxis\": {\"title\": 'Value in GWh', \"titleTextStyle\": {\"color\": 'red'}},\n    \"labelPosition\":\"right\",\"is3D\":true,\"hasLabelsColumn\":true,},\n    \"refreshInterval\":5,   \n    }\n  <\/script><br \/><sup>Source: Energy Report, INSTAT<br \/>Comment and analysis: ODA<\/sup><\/p>\n<p>As years have gone by, the strucutre of use as changed. From a ratio of Losses\/Consumers of 1.4\/1 (for every 100 kwh that was being used by the consumers, 140 kwh were losses in the grid) in 1998, the use of electricity by consumers gained increasingly. In 2002, this ratio was 0.54\/1 and in 2010 0.47\/1. The lower ratio translates in growing efficiency of the use of electricity. Nevertheless, since this ratio is mainly a result of the increased consumption rather than decreased losses, the efficiency of use continues to remain very low.<\/p>\n<p>After 2008, a higher consumption is noticeable. Compared with 2007, it was 14% higher, and in 2009 and 2010 it was respectively 3% and 7% higher. Such increase is primarily due to fewer interruptions, which after 2009 have been almost zero, thus the increase of consumption cannot be equal to the increase of demand for electricity.<\/p>\n<p>Export is the third important category of the use of electricity. Because our country relies on hydric sources to produce electricity, the years with levels of precipitation have enabled higher exports. The data used by Open Data Albania takes into account energy exports including exports resulting from exchange agreements. According to the graph, year 2010 was the most favorable to export given the high domestic production.<\/p>\n<p>All the information is shown in the table below:<\/p>\n<p>  <script type=\"text\/javascript\" src=\"http:\/\/ajax.googleapis.com\/ajax\/static\/modules\/gviz\/1.0\/chart.js\">{\"dataSourceUrl\":\"https:\/\/docs.google.com\/spreadsheet\/tq?range=A22%3AD35&key=0Agylwmr5tEbVdDM3bVR6c0pLUkw0TTh3MkdUS1lsQUE&gid=0&headers=-1\",\"options\":{\"displayAnnotations\":true,\"showTip\":true,\"dataMode\":\"markers\",\"fontColor\":\"#fff\",\"midColor\":\"#36c\",\"pointSize\":0,\"colors\":[\"#3366CC\",\"#DC3912\",\"#FF9900\",\"#109618\",\"#990099\",\"#0099C6\",\"#DD4477\",\"#66AA00\",\"#B82E2E\",\"#316395\"],\"headerColor\":\"#3d85c6\",\"smoothLine\":false,\"lineWidth\":2,\"maxColor\":\"#222\",\"headerHeight\":40,\"labelPosition\":\"right\",\"is3D\":false,\"fontSize\":\"14px\",\"hasLabelsColumn\":true,\"wmode\":\"opaque\",\"hAxis\":{\"maxAlternation\":1},\"maxDepth\":2,\"allowCollapse\":true,\"minColor\":\"#ccc\",\"mapType\":\"hybrid\",\"width\":630,\"height\":350},\"state\":{},\"chartType\":\"Table\",\"chartName\":\"Chart 1\"}\n  <\/script> <br \/><sup>Source: Energy Report, INSTAT<br \/>Comment and analysis: ODA<\/sup><br \/> \n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Use of electricity is one of the parameters that enables us to analyze the efficiency of the utilization of the electric energy. Total sources of electricity serve one or more of the following main categories: consumers, export, and losses in the grid. Source: Energy Report, INSTATComment and analysis: ODA As years have gone by, the strucutre of use as changed. From a ratio of Losses\/Consumers&hellip; <\/p>\n","protected":false},"author":5,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"spay_email":"","jetpack_publicize_message":"","jetpack_is_tweetstorm":false},"categories":[57],"tags":[],"jetpack_featured_media_url":"","jetpack_publicize_connections":[],"jetpack_sharing_enabled":true,"jetpack-related-posts":[{"id":23327,"url":"https:\/\/ndiqparate.al\/?p=23327&lang=en","url_meta":{"origin":8598,"position":0},"title":"The Politiko.Al portal writes: Tenders with Red Flag by the value tendered, with Municipality of Tirana ranking on top","date":"December 14, 2024","format":false,"excerpt":"Title: Tenders with Red Flag by the value tendered, with Municipality of Tirana ranking on top Published: September 19, 2023","rel":"","context":"In &quot;ODA in media&quot;","img":{"alt_text":"","src":"https:\/\/i1.wp.com\/ndiqparate.al\/wp-content\/uploads\/2025\/01\/Screenshot-2025-01-14-115919.png?fit=856%2C875&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":24046,"url":"https:\/\/ndiqparate.al\/?p=24046&lang=en","url_meta":{"origin":8598,"position":1},"title":"Public Property Auctioned Without Competition By-Passing off the Electronic Procurement System","date":"April 17, 2025","format":false,"excerpt":"Over the past ten years, 41 municipalities in the country have auctioned or leased 6 350 hectares of public land, pastures and forests for use by private businesses. These auctions have been conducted by passing off the transparent competitive procedures, without being carried out through the Electronic Procurement System of\u2026","rel":"","context":"In &quot;ODA in media&quot;","img":{"alt_text":"","src":"https:\/\/i1.wp.com\/ndiqparate.al\/wp-content\/uploads\/2025\/04\/Screenshot-2025-04-17-170740.png?fit=743%2C423&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":23281,"url":"https:\/\/ndiqparate.al\/?p=23281&lang=en","url_meta":{"origin":8598,"position":2},"title":"TV Ora News: Five years after the earthquake, the tenders for reconstruction continue. Is the process being used for campaigns?","date":"January 7, 2025","format":false,"excerpt":"Title: Five years after the earthquake, the tenders for reconstruction continue. Is the process being used for campaigns? Published: October 17, 2024","rel":"","context":"In &quot;ODA in media&quot;","img":{"alt_text":"","src":"https:\/\/i0.wp.com\/ndiqparate.al\/wp-content\/uploads\/2025\/01\/Screenshot-2025-01-14-103232.png?fit=1141%2C881&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":24162,"url":"https:\/\/ndiqparate.al\/?p=24162&lang=en","url_meta":{"origin":8598,"position":3},"title":"Capacity Raising Workshop: Public Contracting Cycle - Integrity and Risk Elements during the Procurement Procedures - OpenData in Corruption in Corruption Prevention","date":"June 28, 2024","format":false,"excerpt":"Organizer:\u00a0AIS, promotor of Open Data Albania Title: The Risk Elements during the Public Procurement Procedures. Project: This activity takes place within the framework of the EU4 Project Rule of Law Citizens Engagement for Public Integrity CEPI in the Western Balkans and Turkey. The Project is Funded by the European Union.\u2026","rel":"","context":"In &quot;ODA in Press Releases&quot;","img":{"alt_text":"","src":"https:\/\/i2.wp.com\/ndiqparate.al\/wp-content\/uploads\/2024\/07\/20240627_102913-1.jpg?fit=1200%2C560&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":25437,"url":"https:\/\/ndiqparate.al\/?p=25437&lang=en","url_meta":{"origin":8598,"position":4},"title":"Newsletter Public Procurement in Election Years: Findings on Risk, Competition, and Financial Efficiency","date":"January 20, 2026","format":false,"excerpt":"The organization AIS \/ Open Data Albania has drafted the monitoring and evidence-based report \u201cPublic Procurement in Election Years: Statistical Evidence and Risk Analysis 2015\u20132025\u201d. The study examines the behavior of public procurement over a decade and highlights the connection between electoral processes and indicators of volume, competition, integrity and\u2026","rel":"","context":"In &quot;ODA in Press Releases&quot;","img":{"alt_text":"","src":"https:\/\/i0.wp.com\/ndiqparate.al\/wp-content\/uploads\/2026\/07\/4ce0f889-5f0a-4ecd-a1e2-7ec4ef28b875.png?fit=1200%2C728&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":24783,"url":"https:\/\/ndiqparate.al\/?p=24783&lang=en","url_meta":{"origin":8598,"position":5},"title":"Strengthening Women\u2019s Participation in Public Procurement: AIS Convenes High-Level Roundtable","date":"December 20, 2025","format":false,"excerpt":"Empowering Women Entrepreneurs to successfully bid in Public Tendering for Local Government Units - this was the title of the roundtable held on 19 December, organized by AIS. During this roundtable, data and challenges related to the economic empowerment of women and gender groups were presented in the areas of\u2026","rel":"","context":"In &quot;ODA in Press Releases&quot;","img":{"alt_text":"","src":"https:\/\/i0.wp.com\/ndiqparate.al\/wp-content\/uploads\/2025\/12\/WhatsApp-Image-2025-12-20-at-16.32.06.jpeg?fit=1200%2C900&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]}],"jetpack_shortlink":"https:\/\/wp.me\/pcJP0S-2eG","_links":{"self":[{"href":"https:\/\/ndiqparate.al\/index.php?rest_route=\/wp\/v2\/posts\/8598"}],"collection":[{"href":"https:\/\/ndiqparate.al\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ndiqparate.al\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/ndiqparate.al\/index.php?rest_route=\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/ndiqparate.al\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=8598"}],"version-history":[{"count":0,"href":"https:\/\/ndiqparate.al\/index.php?rest_route=\/wp\/v2\/posts\/8598\/revisions"}],"wp:attachment":[{"href":"https:\/\/ndiqparate.al\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=8598"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ndiqparate.al\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=8598"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ndiqparate.al\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=8598"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}