{"id":9915,"date":"2015-11-27T11:07:07","date_gmt":"2015-11-27T11:07:07","guid":{"rendered":""},"modified":"2022-05-06T13:41:41","modified_gmt":"2022-05-06T13:41:41","slug":"indicators-of-2014-public-procurement-tender-procedures-clients-and-competitiveness-at-himare-municipality","status":"publish","type":"post","link":"https:\/\/ndiqparate.al\/?p=9915&lang=en","title":{"rendered":"Indicators of 2014 Public Procurement, Tender Procedures, Clients and Competitiveness at Himare Municipality"},"content":{"rendered":"<div align=\"justify\">Open Data Albania is investigating on indicators of the public procurement process in those municipalities where mayors have been reelected for another term during Local Government Elections of 21 June 2015. Mr <a href=\"http:\/\/spending.data.al\/sq\/moneypower\/view\/id\/53\">Jorgo Goro<\/a>, Major of Himara Municipality, was re-elected for a second term. The research was focused on public procurements announced in the twelve months of 2014. <p><\/p>\n<p>The indicators provide information on the number of procurement procedures, the structure by type of procedure, the tendered amounts and their distribution by customers. The analysis is especially focused on competitiveness procedures according to tenders categorized in four levels: with one operator due to lack of competitiveness, with two to three operators, with four to ten operators or more than ten operators (high competitiveness).<\/p>\n<p><sup><iframe width=\"630\" height=\"371\" frameborder=\"0\" seamless=\"\" scrolling=\"no\" src=\"https:\/\/docs.google.com\/spreadsheets\/d\/1L2dRAfmidzjJ6r2Jv7gcVCNj-dZ4Px1SubN6VL8FyGs\/pubchart?oid=831626027&amp;format=interactive\"><\/iframe><\/sup><br><sup>Source: PPA Bulletin<br>Analysis and Comments: ODA<\/sup><\/p>\n<p><br><iframe width=\"630\" height=\"371\" frameborder=\"0\" scrolling=\"no\" seamless=\"\" src=\"https:\/\/docs.google.com\/spreadsheets\/d\/1L2dRAfmidzjJ6r2Jv7gcVCNj-dZ4Px1SubN6VL8FyGs\/pubchart?oid=1306441025&amp;format=interactive\"><\/iframe><br><sup>Source: PPA Bulletin<br>Analysis and Comments: ODA<\/sup><\/p>\n<p><iframe width=\"630\" height=\"371\" frameborder=\"0\" seamless=\"\" scrolling=\"no\" src=\"https:\/\/docs.google.com\/spreadsheets\/d\/1L2dRAfmidzjJ6r2Jv7gcVCNj-dZ4Px1SubN6VL8FyGs\/pubchart?oid=337024108&amp;format=interactive\"><\/iframe><br>Source: PPA Bulletin<br>Analysis and Comments: ODA<\/p>\n<p><iframe width=\"622.5\" height=\"371\" frameborder=\"0\" scrolling=\"no\" seamless=\"\" src=\"https:\/\/docs.google.com\/spreadsheets\/d\/1L2dRAfmidzjJ6r2Jv7gcVCNj-dZ4Px1SubN6VL8FyGs\/pubchart?oid=898528867&amp;format=interactive\"><\/iframe><br>Source: PPA Bulletin<br>Analysis and Comments: ODA<\/p>\n<p><b>The amount for announced and finalized procurements with contract endorsement 2014, Himare Municipality<\/b><sup><\/sup><\/p>\n<p><iframe width=\"628.5\" height=\"226.5\" frameborder=\"0\" seamless=\"\" scrolling=\"no\" src=\"https:\/\/docs.google.com\/spreadsheets\/d\/1L2dRAfmidzjJ6r2Jv7gcVCNj-dZ4Px1SubN6VL8FyGs\/pubchart?oid=172208139&amp;format=interactive\"><\/iframe><\/p>\n<p>Source: PPA Bulletin<br>Analysis and Comments: ODA<\/p>\n<p><iframe width=\"614\" height=\"371\" frameborder=\"0\" scrolling=\"no\" seamless=\"\" src=\"https:\/\/docs.google.com\/spreadsheets\/d\/1L2dRAfmidzjJ6r2Jv7gcVCNj-dZ4Px1SubN6VL8FyGs\/pubchart?oid=1054121205&amp;format=interactive\"><\/iframe><br>Source: PPA Bulletin<br>Analysis and Comments: ODA<\/p>\n<p><iframe width=\"630\" height=\"371\" frameborder=\"0\" seamless=\"\" scrolling=\"no\" src=\"https:\/\/docs.google.com\/spreadsheets\/d\/1L2dRAfmidzjJ6r2Jv7gcVCNj-dZ4Px1SubN6VL8FyGs\/pubchart?oid=244940898&amp;format=interactive\"><\/iframe><br>Source: PPA Bulletin<br>Analysis and Comments: ODA<\/p>\n<p><b>Amounts procured by Categories of Expenditures , Goods. Services and Public Works, Himare Municipality 2014.<br><\/b><sup><br><iframe width=\"617.5\" height=\"154.5\" frameborder=\"0\" scrolling=\"no\" seamless=\"\" src=\"https:\/\/docs.google.com\/spreadsheets\/d\/1L2dRAfmidzjJ6r2Jv7gcVCNj-dZ4Px1SubN6VL8FyGs\/pubchart?oid=2064798715&amp;format=interactive\"><\/iframe><br>Source: PPA Bulletin<br>Analysis and Comments: ODA<\/sup><\/p>\n<p><b>Competitiveness in Public Procurement, Himare Municipality 2014 <\/b><sup><\/sup><\/p>\n<p><iframe width=\"630\" height=\"214.5\" frameborder=\"0\" seamless=\"\" scrolling=\"no\" src=\"https:\/\/docs.google.com\/spreadsheets\/d\/1L2dRAfmidzjJ6r2Jv7gcVCNj-dZ4Px1SubN6VL8FyGs\/pubchart?oid=1050412402&amp;format=interactive\"><\/iframe><br>Source: PPA Bulletin<br>Analysis and Comments: ODA<\/p>\n<p><iframe width=\"614\" height=\"371\" frameborder=\"0\" scrolling=\"no\" seamless=\"\" src=\"https:\/\/docs.google.com\/spreadsheets\/d\/1L2dRAfmidzjJ6r2Jv7gcVCNj-dZ4Px1SubN6VL8FyGs\/pubchart?oid=734032018&amp;format=interactive\"><\/iframe><br><sup>Source: PPA Bulletin<br>Analysis and Comments: ODA<\/sup><\/p>\n<p><iframe width=\"630\" height=\"371\" frameborder=\"0\" seamless=\"\" scrolling=\"no\" src=\"https:\/\/docs.google.com\/spreadsheets\/d\/1L2dRAfmidzjJ6r2Jv7gcVCNj-dZ4Px1SubN6VL8FyGs\/pubchart?oid=2109927823&amp;format=interactive\"><\/iframe><br><sup>Source: PPA Bulletin<br>Analysis and Comments: ODA<\/sup><\/p>\n<p><iframe width=\"630\" height=\"371\" frameborder=\"0\" scrolling=\"no\" seamless=\"\" src=\"https:\/\/docs.google.com\/spreadsheets\/d\/1L2dRAfmidzjJ6r2Jv7gcVCNj-dZ4Px1SubN6VL8FyGs\/pubchart?oid=545534692&amp;format=interactive\"><\/iframe><br><sup>Source: PPA Bulletin<br>Analysis and Comments: ODA<\/sup><\/p>\n<p><b>Order of Operators by Procured Value , Himare Municipality 2014<\/b><sup><\/sup><\/p>\n<p><iframe width=\"630\" height=\"247.5\" frameborder=\"0\" seamless=\"\" scrolling=\"no\" src=\"https:\/\/docs.google.com\/spreadsheets\/d\/1L2dRAfmidzjJ6r2Jv7gcVCNj-dZ4Px1SubN6VL8FyGs\/pubchart?oid=1195905220&amp;format=interactive\"><\/iframe><br><sup><br>Source: PPA Bulletin<br>Analysis and Comments: ODA <br><\/sup><iframe width=\"630\" height=\"371\" frameborder=\"0\" scrolling=\"no\" seamless=\"\" src=\"https:\/\/docs.google.com\/spreadsheets\/d\/1L2dRAfmidzjJ6r2Jv7gcVCNj-dZ4Px1SubN6VL8FyGs\/pubchart?oid=1424268184&amp;format=interactive\"><\/iframe><br><sup>Source: PPA Bulletin<br>Analysis and Comments: ODA <\/sup><\/p>\n<p>Definitions: Law on Public Procurement specifies some procedures concerning the implementation of contracts that have as an object: Work, Services, or Purchasing of goods with public funds:<\/p>\n<p>Open procedures are procedures where any interested economic operator may submit a bid.<\/p>\n<p>Limited procedures are procedures whereby only economic operators selected by Contracting Authority are entitled to submit a bid. Restricted procedures are applied for cases where certain technical, professional or financial capacities are necessary for goods, services, or public works. The law also provides for that the contracting authority may also select an operator that it considers as the most economically efficient.<\/p>\n<p>Request for Proposal are procedures when the contracting authority requires bids from a limited number of economic operators it has selected, but accepts even offers presented by other economic interested operators;<\/p>\n<p>The procedures for Consulting Services are of an intellectual and advisory nature and don?t include other types of services where the physical aspects of the activity predominate;<\/p>\n<p>Procedures with Design Competition are all those procedures during which a jury set up for the competition process by the Contracting Authority selects a study, or a project that entirely have an aesthetic nature mainly in the field of urban, rural, architectural planning etc.<\/p>\n<p>The law provides for Procedures with Negotiations in all cases when the above procedures result unsuccessful, bidders become invalid, or don?t meet the requirements of the national legal provisions. This is also true for emergency cases, cases when the copyright must not be infringed, or when goods are quoted on the stock exchange. In the case of the negotiated procedure the contracting authority selects personally the economic operator and establishes the terms of the contract.<\/p>\n<p>&nbsp;Negotiated procedures are also applied in case of additions to contracts, supplement work or services, which were not included in the initial contract, but due to unforeseen circumstances have become necessary. Supplements to the contract are also applied when additional constructions, or services cannot be separated from the original contract without causing major technical and economic difficulties to the Contracting Authority provided that the additional value does not exceed 20% of the value of the initial contract.<br><sup><br><\/sup>\n<\/p><\/div>\n\n\n<b>Comments and Analysis:<\/b> Open Data Albania<br> \nContributed by: Eva Meqemeja<br>\n","protected":false},"excerpt":{"rendered":"<p>Open Data Albania is investigating on indicators of the public procurement process in those municipalities where mayors have been reelected for another term during Local Government Elections of 21 June 2015. Mr Jorgo Goro, Major of Himara Municipality, was re-elected for a second term. The research was focused on public procurements announced in the twelve months of 2014. The indicators provide information on the number&hellip; <\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"spay_email":"","jetpack_publicize_message":"","jetpack_is_tweetstorm":false},"categories":[57],"tags":[],"jetpack_featured_media_url":"","jetpack_publicize_connections":[],"jetpack_sharing_enabled":true,"jetpack-related-posts":[{"id":25437,"url":"https:\/\/ndiqparate.al\/?p=25437&lang=en","url_meta":{"origin":9915,"position":0},"title":"Newsletter Public Procurement in Election Years: Findings on Risk, Competition, and Financial Efficiency","date":"January 20, 2026","format":false,"excerpt":"The organization AIS \/ Open Data Albania has drafted the monitoring and evidence-based report \u201cPublic Procurement in Election Years: Statistical Evidence and Risk Analysis 2015\u20132025\u201d. The study examines the behavior of public procurement over a decade and highlights the connection between electoral processes and indicators of volume, competition, integrity and\u2026","rel":"","context":"In &quot;ODA in Press Releases&quot;","img":{"alt_text":"","src":"https:\/\/i0.wp.com\/ndiqparate.al\/wp-content\/uploads\/2026\/07\/4ce0f889-5f0a-4ecd-a1e2-7ec4ef28b875.png?fit=1200%2C728&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":23234,"url":"https:\/\/ndiqparate.al\/?p=23234&lang=en","url_meta":{"origin":9915,"position":1},"title":"Collaboration with Institutions. There has been public pressure for investigations and audits of reported high-risk cases.","date":"November 13, 2024","format":false,"excerpt":"The High State Audit (ALSAI), in preparing its Annual Audit Planning Methodology document, published in March 2024, (page 7), listed AIS\u2019s Open Data platforms - Open Procurement Albania and Open Spending Albania - as sources contributing to the collection of information and alerts during the drafting it\u2019s the Annual Audit\u2026","rel":"","context":"In &quot;ODA in Press Releases&quot;","img":{"alt_text":"","src":"https:\/\/i2.wp.com\/ndiqparate.al\/wp-content\/uploads\/2025\/01\/image-2-1.png?fit=1153%2C873&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":24340,"url":"https:\/\/ndiqparate.al\/?p=24340&lang=en","url_meta":{"origin":9915,"position":2},"title":"Draft Law on PPP Concessions: AIS (NGO) Raises Concerns regarding Compliance with EU Directives and Calls for Thorough Revision","date":"June 13, 2025","format":false,"excerpt":"The organization AIS, promoter of Open Data Albania, has taken part in the public consultation process with the Albanian Government following the preparation of the Draft Law on Concessions and Public - Private Partnerships (PPP). This draft law represents both an obligation and a commitment by the Albanian State to\u2026","rel":"","context":"In &quot;ODA in Press Releases&quot;","img":{"alt_text":"","src":"https:\/\/i2.wp.com\/ndiqparate.al\/wp-content\/uploads\/2025\/06\/Screenshot-2025-06-13-143412-1.png?fit=1200%2C721&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":24456,"url":"https:\/\/ndiqparate.al\/?p=24456&lang=en","url_meta":{"origin":9915,"position":3},"title":"AIS and ACER express concern over the situation at the highest institution of the public procurement sector","date":"July 29, 2025","format":false,"excerpt":"The two non-governmental organizations engaged in anti-corruption issues, AIS and ACER, express concern about the current situation affecting the functioning and integrity of the Public Procurement Commission (PPC), the highest state authority in the field of public procurement. The right of businesses to have access to an effective appeal mechanism\u2026","rel":"","context":"In &quot;ODA in Press Releases&quot;","img":{"alt_text":"","src":"https:\/\/i2.wp.com\/ndiqparate.al\/wp-content\/uploads\/2025\/07\/WhatsApp-Image-2025-04-19-at-16.16.18-1.jpeg?fit=800%2C556&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":25229,"url":"https:\/\/ndiqparate.al\/?p=25229&lang=en","url_meta":{"origin":9915,"position":4},"title":"Albania Joins OpenTender Europe: Big Data for Public Procurement (2010 - 2026)","date":"April 30, 2026","format":false,"excerpt":"Albanian Institute of Science (AIS) \/ Open Data Albania, in partnership with a European team of organizations and institutions working in the field of anti-corruption, is contributing to the assessment of public procurement in Albania according to European Union standards. OpenTender Europe, one of the best-known platforms in the European\u2026","rel":"","context":"In &quot;ODA in Press Releases&quot;","img":{"alt_text":"","src":"https:\/\/i1.wp.com\/ndiqparate.al\/wp-content\/uploads\/2026\/05\/Screenshot_30-4-2026_18242_opentender.eu_-1.jpeg?fit=1200%2C444&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":25285,"url":"https:\/\/ndiqparate.al\/?p=25285&lang=en","url_meta":{"origin":9915,"position":5},"title":"AIS Position on the Upcoming Rule of Law Report","date":"February 20, 2026","format":false,"excerpt":"The organization AIS wishes to express its concerns regarding several critical aspects of the rule of law in Albania, with a focus on the State-Owned Enterprises (SOEs) sector and legislation affecting Public Procurement, Public-Private Partnerships (PPPs), and the privatization of state assets. 1. The SOE Sector as a High-Risk Area\u2026","rel":"","context":"In &quot;ODA in Press Releases&quot;","img":{"alt_text":"","src":"https:\/\/i1.wp.com\/ndiqparate.al\/wp-content\/uploads\/2026\/05\/Screenshot-2026-05-27-090928.png?resize=350%2C200&ssl=1","width":350,"height":200},"classes":[]}],"jetpack_shortlink":"https:\/\/wp.me\/pcJP0S-2zV","_links":{"self":[{"href":"https:\/\/ndiqparate.al\/index.php?rest_route=\/wp\/v2\/posts\/9915"}],"collection":[{"href":"https:\/\/ndiqparate.al\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ndiqparate.al\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/ndiqparate.al\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/ndiqparate.al\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=9915"}],"version-history":[{"count":1,"href":"https:\/\/ndiqparate.al\/index.php?rest_route=\/wp\/v2\/posts\/9915\/revisions"}],"predecessor-version":[{"id":16920,"href":"https:\/\/ndiqparate.al\/index.php?rest_route=\/wp\/v2\/posts\/9915\/revisions\/16920"}],"wp:attachment":[{"href":"https:\/\/ndiqparate.al\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=9915"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ndiqparate.al\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=9915"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ndiqparate.al\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=9915"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}